Stage 1

This project had two stages due to planning coming in for new build of two flats to rear and stage 1 being change of use from offices to four flats. The landscaping required where proxy resin driveway with electric gate build into a London stock build brick wall with stone work and bespoke fabrication of metal railings to gate, railing, all light wells.

Stage 1 consist of extension to rear where there was a infill due to upper level overhanging on pillars, a basement dig out, new party walls through all level, new roof, new light well to side and rear. Windows new timber sliding sashes double glaze. Basement tanking method three coats sila render.
Stage 2 consist of 5m dig out due to the the two storey new deluxe flats, underpinning existing building and all existing garden boundary building wall, MVHR(
Heat recovery ventilation, also known as mechanical ventilation heat recovery, is an energy recovery ventilation system which works between two sources at different temperatures. Heat recovery is a method which is increasingly used to reduce the heating and cooling demands of buildings.), green wild flower roofs. Basement drainage system was done in a dual pump system with battery backup, monitoring visa internet or home screen, alarm system. Basement tanking method is a drainage system.

Finishing to all six flats oak staircase to three deluxe flats, Miele applaines, solid oak flooring, oak doors, ultra high gross Handle less kitchens, incom system, camera system, boiler fitted with weather compensation(tells the boiler to alter the temperature of the radiators to match the extra heat loss caused by a cold day, leading to a more comfortable and consistent environment. Having this level of control over your boiler means that it will never generate more energy than what is actually required.

PROJECT DETAIL

  • Budget: £1 350 000,00